
Originally Posted by
natenator
Agreed. Although most of those look like warm-ups while leading into the heaviest working sets it is an incorrect way to go about this.
What I would do instead is:
95x15
135x15
175x6
225x3
275x1
What first 3 sets are meant just to warm the muscle/knee and get some blood flowing with remaining 3 getting your body adjusted to the heavier weight without actually fatiguing the system.